LEAD FPX 5220 Assessment 3 Championing Organizational Change
- High Quality FPX Sample Assessment
- Step-by-Step Guide to master FPX Assessment
- References (APA Format) for related Assessments
- Connect with Top professors for specific class
- Detailed (FAQs) related to Assessment.
- Express Delivery with in 24 hours.
Assessment Overview:
LEAD FPX 5220 Assessment 3: asks you to make a stakeholder chart and change plans for introducing 3- D/ cumulative manufacturing at Ingalls Shipbuilding. You should epitomize the change, identify crucial stakeholders and their enterprises, show how the change will affect each group, propose tactics to manage resistance, and finish with recommended ways for backing the change.
How to Pass LEAD FPX 5220 Assessment 3 Championing Organizational Change
- Define the Stakeholder Power Grid: Use a 2×2 matrix.
- High Power/High Interest: These are your “Key Players” (e.g., The Navy, VP of Ops).
- High Power/Low Interest: These are people you must “Keep Satisfied” (e.g., Shareholders).
- Link Technology to Mission: Don’t just talk about “3-D printers.” Talk about “Fleet Readiness.” If Ingalls can print a part in 24 hours instead of waiting 6 months for a casting, the Navy’s ships get back to sea faster.
- The “Prototyping” Olive Branch: To win over skeptical engineers, recommend using 3-D printing for prototypes first. This allows them to see the technology work in a low-risk environment before it’s used for structural ship components.
- Address the Labor Fear: With 37,000 workers, the fear of “automation replacing jobs” is real. Your plan must include a Workforce Reskilling Program. Explain that 3-D printing doesn’t replace the worker; it replaces the old tool the worker uses.
- Procurement Shift: Explain that procurement is no longer just buying “steel.” It’s now buying “feedstock” (powders and polymers). This is a major shift in Supplier Relationship Management.
- Draft a “Win-Win” Memo: When writing to your Change Champion, focus on the Triple Bottom Line:
- Cost (lower waste).
- Speed (faster lead times).
- Quality (more complex, lighter designs).
- Map the “Political Landscape”: Acknowledge that departments like “Design” and “Procurement” might clash over who owns the 3-D printing budget. Your champion needs to know where the internal friction will be.
- Set a “Pilot” Timeline: Don’t try to change the whole shipyard at once. Propose a 6-month pilot program focused on one specific ship class or one specific type of component.
- Define Success KPIs:
- Lead Time: Reduction from months to days for specific parts.
- Scrap Rate: Reduction in material waste.
- Competency: Number of workers certified in additive manufacturing.
- The “National Security” Angle: Since 97% of income is from the Navy, mention that the U.S. government is actively pushing for Digital Twins and advanced manufacturing to maintain a competitive edge over global adversaries.
Sample Assessment:
Championing Organizational Change
Stakeholder Map for Change in Ingalls Shipbuilding
The author, a Procurement Critic at Ingalls Shipbuilding, is developing a stakeholder chart to grease a significant organizational change. A memorandum will be created to present an offer to a change champion who can endorse and support this action. The memo will outline the recommended changes, their implicit impacts on colorful places within Ingalls, and strategies for addressing any resistance to change.
Change Overview
Ingalls is transitioning to 3- D technology to enhance its manufacturing processes. It’s pivotal for the change representative to navigate the political geography effectively, icing they retain the authority to apply these changes. The change agent should promote rational metamorphosis and inspire associates at Ingalls to unite and execute these changes.
The stakeholder chart will serve as a tool for operation to grasp stakeholder positions and their readiness for change. This mapping process involves exploration, conversations, and debates that incorporate different perspectives to identify essential stakeholders. The original step includes gathering opinions from stakeholders.
Stakeholder Identification
Ingalls’ stakeholders include shareholders, as the company is intimately traded. Its client base is limited to the U.S. government, specifically the Navy and Coast Guard. The fiscal performance of Ingalls is nearly tied to the U.S. frugality and defense sector. As the sole supplier of shipbuilding services for the U.S. government, Ingalls holds significant logrolling power and stands to profit from current trends in nonmilitary expansion.
Ingalls is a major employer in Mississippi and ranks among the top employers in Alabama. The company’s request capitalization is roughly$ 1.89 billion, with the maturity of its income deduced from U.S. government contracts 97 from the Navy and 3 from the Coast Guard. Ingalls’ competitive advantage lies in its professed pool, devoted to producing high- quality vessels.
Workforce Development
According to Ingalls, “ At Huntington Ingalls diligence( HII), a company with nearly 37,000 workers and a constant demand to fill positions at all situations — especially professed trades positions, we invest further than$ 110 million a time in pool development ”( Archived, 2017). The company is also committed to commercial social responsibility, seeking to cover its functional terrain.
Consideration of literal assignments and ongoing engagement is essential in developing the stakeholder chart. Presently, Ingalls is constructing five different types of large vessels for the U.S. government. The company boasts an 81- time heritage of shipbuilding excellence, able to contemporaneously produce multiple classes of vessels( Who We Are, 2018).
Impact of 3-D Technology
The perpetration of 3- D technology is anticipated to enhance manufacturing effectiveness, performing in quicker boat development and better quality. 3- D printing, a hand of cumulative manufacturing, allows for subcaste- by- subcaste products, which contrasts with traditional subtractive styles. The design platoon at Ingalls is responsible for developing delineations for the affair, while procurement must acquire accoutrements for the 3- D printers, including plastics, essence, concrete, and biomaterials.
This technology will also affect transportation and logistics, transubstantiating force chains. The capability to 3- D print accoutrements will reduce request entry times and alleviate pitfalls in force chain operation. Ingalls can reference designs encyclopedically and produce them locally using 3- D printing technology.
Stakeholder Perspectives on 3-D Technology
The preface of 3- D technology will have varying goods on stakeholders. Communication across departments must acclimatize to incorporate new technologies to insure flawless access for all workers.
Employment is another significant area affected. As Ingalls adopts advanced manufacturing ways, the company must seek professed workers capable of operating 3- D ministry. Reduced labor and transportation costs may lower overall system charges, allowing for implicit manufacturing redistribution closer to home.
Managing Resistance to Change
Resistance from masterminds, operation, and other departments is a primary challenge associated with the preface of 3- D technology. To overcome this, Ingalls can use 3- D printing for prototyping, allowing departments to come familiar with the technology gradually. Incremental changes can be introduced to ease the transition and minimize resistance.
Conclusion
By addressing resistance courteously and strategically, Ingalls can successfully apply the transition to 3- D technology and enhance its functional effectiveness.
Table: Stakeholder Map for Ingalls Shipbuilding
| Shareholders | Owners of the company | Potential for increased profits due to enhanced efficiency. |
| U.S. Government | Primary customer | Improved delivery timelines and product quality. |
| Employees | Largest workforce | Need for skill development in advanced manufacturing. |
| Procurement | Material acquisition | Change in sourcing strategies and supplier relationships. |
| Design Team | Responsible for ship designs | Shift towards integrating 3-D design capabilities. |
| Management | Overseeing operations | Need to adapt to new technologies and manage workforce training. |
LEAD FPX 5220 Assessment 3 Championing Organizational Change
Who We Are. (2018).
References (APA 7 Format)
- Archived Content. (2017). Retrieved from https://www.businessroundtable.org/archive/skillsgap/huntington-ingalls-industries
Rubric Breakdown
| Criteria | Distinguished | Proficient | Basic | Non-Performance |
| Stakeholder Mapping | Critically prioritizes stakeholders based on influence and interest, identifying hidden “blockers” and “promoters.” | Identifies and maps key stakeholders for the 3-D technology change. | Lists stakeholders but fails to categorize their interests or potential impact on the project. | No mapping provided. |
| Change Vision | Presents a compelling vision for 3-D technology that links manufacturing efficiency to national defense goals. | Summarizes the proposed change and its benefits for the organization. | Describes the technology but fails to articulate a clear vision for organizational change. | No vision provided. |
| Manage Resistance | Proposes sophisticated, tiered strategies to mitigate resistance (e.g., prototyping for engineers, training for laborers). | Identifies potential sources of resistance and strategies to address them. | Mentions that people might be unhappy but lacks specific tactics to manage that resistance. | No resistance plan. |
| Champion Memo | Drafts a professional, persuasive memorandum to an executive that clearly outlines the ROI and resource needs. | Creates a memo to a change champion seeking endorsement for the initiative. | Drafts a message that lacks executive tone or clear calls to action. | No memo included. |
| Evaluation Metrics | Defines specific, measurable KPIs (lead time, defect rates, skill certifications) to track the transition. | Outlines coming steps and success criteria for the 3-D technology implementation. | Suggests checking for success without defining specific metrics or a timeline. | No evaluation plan. |
Step-by-Step Guide
- Title & Change statement Title, name, course details one- line change ideal( e.g., “ Introduce 3- D printing to ameliorate prototyping, reduce lead times, and enable localized product ”).
- List stakeholders Quick list( Shareholders, U.S. Government/ guests, elderly operation, Engineering/ design, Procurement, product/ pool, Logistics, Unions).
- Stakeholder interests & impact( one line each) For each stakeholder note the benefit and concern( e.g., workers profit new chops; concern job changes).
- Readiness & influence mapping Mark each stakeholder as High/ Medium/ Low on influence and support( e.g., Management High influence/ Medium support; Engineers High influence/ Low support).
- Resistance operation tactics Short conduct — airman prototyping, targeted training programs,co-design shops with masterminds, seller hookups, clear dispatches to guests and controllers
- Change champion memo( 2 – 3 pellets) Ask a guarantor with authority; epitomize ROI, threat mitigation( airman training), timeline, and resource ask.
- Coming way & criteria Airman( 3 – 6 months), pool training, supplier trials; measure prototype cycle time, disfigurement rate, cost per part, hand instrument counts.
Frequently Asked Questions
Q Who should be the change champion?
Elderly leader with budget authority and credibility with engineering and operations( e.g., VP of Manufacturing or CTO).
Q How to reduce mastermind resistance?
Involve them beforehand in airman design, show data from prototypes, and offer hands- on training and career development.
Q What’s a good airman compass?
Launch withnon-critical corridor or prototyping for one boat class for 3 – 6 months.
Q How do you measure success?
Track prototype lead time reduction, part cost comparisons, disfigurement/ fit issues, and hand upskilling criteria .
Q What’s the top communication move?
Launch a clear, honest stakeholder detail that explains benefits, pitfalls, timeline, and training/ support available.
Integrity Note
Note: Only use this assessment example for learning and structure purpose. Do not submit as your own work.
We are an independent resource and are not affiliated with Capella University.





