event
PM FPX 4060 Assessment 3

PM FPX 4060 Assessment 3 Project GCSP 

Assessment Overview:

PM FPX 4060 Assessment 3: focuses on the Project Charter for the Guided client Service Program( GCSP) at Webster Insurance. The duty formally authorizes the design, defines objects, deliverables, budget, pitfalls, and places liabilities. It serves as the foundation for design planning and prosecution, icing stakeholder alignment and guiding threat operation throughout the design lifecycle. 

How to Pass PM FPX 4060 Assessment 3 Project GCSP 

  1. Correct Technical Terminology: Manually fix terms that were likely auto-corrected incorrectly. Change “design duty” to Project Charter, “armature” to architecture, “sins” to weaknesses, and “pitfalls” to risks.
  2. Fix Calendar Errors: Change your finish date from “April 31” to April 30. Small clerical errors can lower your score on professionalism.
  3. Balance the Budget: Your detailed breakdown currently adds up to $1,000,000, but your total project budget is $2,000,000. Explicitly state where the other $1,000,000 is going (e.g., $500,000 for Licensing/Hardware and $500,000 for a Contingency Reserve).
  4. Specific Success Criteria: In your objectives, define what “success” looks like. Instead of just “Reduce costs,” use “Reduce operational costs by 15% within the first year.”
  5. Utilize the RBS Framework: Ensure your Risk Breakdown Structure (RBS) table covers multiple categories: Technical, External, Organizational, and Project Management.
  6. Clarify “TBD” Items: In a final Project Charter, you should avoid leaving items as “TBD.” Provide a preliminary assumption or a specific date by which that risk will be vetted.
  7. Strengthen the SWOT Analysis: Ensure your SWOT directly relates to the GCSP project. For example, a “Threat” could be “Regulatory changes from CMS during the integration phase.”
  8. Define Phase Responsibilities: In your Roles/Responsibilities table, make sure you clearly distinguish who is responsible for signing off on milestones (usually the Sponsor) versus who is executing them.
  9. Professional Formatting: Remove the “Overview,” “Step-by-Step,” and “FAQ” sections before submitting. These are helpful for study but do not belong in a formal Project Charter artifact.
  10. Check APA Citations: Ensure your references are in standard APA 7th edition format. Your current links (like the visual-paradigm or smartsheet links) should be formatted as professional citations.

Sample Assessment:

Project Charter

This design duty outlines the crucial factors necessary to upgrade Webster Insurance’s client service platform to the Guided Client Service Program( GCSP). 

Project Overview

  • Project Title Guided Client Service Program 
  • Project Start Date June 23, 2022 
  • Project Finish Date April 31, 2023 
  • Budget$ 

The budget is distributed as follows 

  • design operation and oversight$ 150,000 
  • System design and armature$ 600,000 
  • Installation and migration of software$ 150,000 
  • Migration of all systems into the new program$ 100,000

The design must remain within the$ 2 million budget, with any cost overrun exceeding 4 being supposedly unprofitable. 

  • Project Manager Angela Guthrie 

Project Objectives

The main ideal is to apply the GCSP, replacing the current client service platform with minimum dislocation. Webster Insurance’s being system is outdated, leading to detainments and system crashes that negatively affect client service( Ganesh, 2020). The new system must 

  • Misbehave with CMS( Center for Medicare Services) conditions 
  • Accommodate current and unborn growth 
  • Be stoner-friendly and ameliorate functional effectiveness 
  • Reduce running time costs 
  • Increase client satisfaction 

Deliverables

Initial Deliverables (Initiation Phase):

  • Team registries 
  • design operation plan 
  • original meeting schedule 

Ongoing Deliverables (Design and Delivery Phase):

  • System integrations list 
  • Meeting notes and progress reports 
  • System demonstrations 

Final Deliverables (Delivery and Acceptance Phase):

  • Completed program database and system integration 
  • CMS compliance blessing 
  • Summary of integration and assignments learned 

Risk Identification and Management

RBS ID Question Answer Mitigation Assigned Preliminary Action
1.1 Is the project scope clearly defined? Yes Validate scope through meetings Confirm scope matches supply.
1.2 Are project deliverables clearly identified? Yes Send preliminary data for approval Ensure system integration compatibility.
1.3 Are estimates and assumptions vetted? TBD Vet suppliers and regulatory bodies Verify assumptions and estimates.
1.4 Are support facilities sufficient? Yes Purchase Salesforce license Ensure platform compatibility.
1.5 Will IT systems support integration? Yes Verify legacy system compatibility Ensure API feeds work properly.
1.6 Are there dependencies on other projects? No N/A No action required.
1.7 Is the design aligned with requirements? Yes Ensure CMS compliance Verify user-friendly design.
1.8 Will the deliverables meet performance needs? Yes Ensure CMS compliance Test functionality.
1.9 Is stability and maintainability confirmed? TBD Verify functionality regularly Perform testing.
1.10 Is the solution safe? No N/A N/A
1.11 Will the system be secure? Yes Ensure HIPAA compliance Conduct security checks throughout.

SWOT Analysis

  • Strengths Endured platoon, estimable insurance establishment, former success with analogous systems. 
  • sins Gradational integration needed due to business operations. 
  • openings Ameliorate client service and business growth. 
  • pitfalls Implicit system comity issues and unlooked-for specialized challenges. 

Roles and Responsibilities

Name Role Phase(s) Responsibility
Steve Smith Project Sponsor All Phases Approval of scope and budget increases
Angela Guthrie Project Manager All Phases Manage all project aspects
Ingrid Sing Product Manager Design & Engineering Ensure program criteria are met
Tracy Weave HR Manager All Phases Manage HR tasks
Gina Willis Procurement Manager All Phases Oversee procurement and financial activities
Deb Keplin Project Administrator All Phases Track change orders, meeting notes
Danny Senn Integration Manager Integration Phase Ensure legacy system integration
Joyce Miller Usability Manager Integration Phase Test usability
Beatrice Jones Customer Representative All Phases Represent customer interests

PM FPX 4060 Assessment 3 Project GCSP 

Project Management Institute.( 2017). companion to the Project Management Body of Knowledge( PMBOK ® companion) — Sixth Edition and Agile Practice Guide. 

Pcubed.( 2004). threat identification questionnaire( Microsoft Word template). recaptured from http://office.microsoft.com/en-us/templates/risk-identification-questionnaireTC001142331.aspx

References (APA 7 Format)

Rubric Breakdown

Criterion Distinguished (Target)
Project Authorization Formally authorizes the project with a clear title, manager, sponsor, and definitive start/end dates.
Project Objectives Objectives are measurable, aligned with business goals, and address CMS/regulatory needs.
Deliverables Identification Lists clear, logical deliverables for Initiation, Design, and Delivery phases.
Risk Identification (RBS) Uses a Risk Breakdown Structure to identify comprehensive risks and provides logical mitigation steps.
SWOT Analysis Provides a deep analysis of internal/external factors specifically impacting the GCSP project.
Roles & Responsibilities Clearly assigns project roles and responsibilities across all lifecycle phases.
APA & Professionalism Document is professional, free of errors, and follows APA 7th edition citation rules.

Step-by-Step Guide

  1. Define Project Overview — Include title, launch/ end dates, budget, and design director. 
  2. Set Project Objectives — Outline pretensions similar to CMS compliance, better effectiveness, and client satisfaction. 
  3. List Deliverables Identify original, ongoing, and final deliverables for each design phase. 
  4. Identify and Manage pitfalls — Use RBS and mitigation strategies for implicit issues like integration, security, and hypotheticals. 
  5. Conduct SWOT Analysis — Evaluate strengths, sins, openings, and pitfalls for design planning. 
  6. Assign places and liabilities Define design guarantor, director, platoon members, and their liabilities across phases. 

Frequently Asked Questions

Q1 What’s the purpose of a design duty? 

To formally authorize the design and give a reference for objects, compass, budget, and places. 

Q2 Who creates the design duty? 

The design director generally prepares it, and the guarantor approves it. 

Q3 What tools are used for threat identification? 

threat Breakdown Structure( RBS), geek analysis, questionnaires, and literal data. 

Q4 How does a duty help the design?

Provides clarity, aligns stakeholders, attendants threat operation, and sets prospects for deliverables and budget.

Integrity Note

Note: Only use this assessment example for learning and structure purpose. Do not submit as your own work.
We are an independent resource and are not affiliated with Capella University.

You cannot copy content of this page

Scroll to Top

Get your FPX Assessments in just 24 hours!

Verification required to avoid bots.